SAP Supply Chain Implementation Partner
SAP Implementation Partner for US Supply Chains

SAP Supply Chain Implementation Partner

Talk to an SAP Expert

SAP Implementation Partner for Warehouses, Transport and Trade

SCM Champs is a US-based SAP supply chain implementation partner for manufacturers, distributors, retailers and 3PLs. We help supply chain, logistics and IT leaders design, build and support SAP EWM, Logistics Management (LGM), TM, Yard Logistics, BN4L, GTS, IBP and S/4HANA, and one team owns your project from the first assessment to hypercare.

Each SAP system does one job, but most of the value comes from how they share data. S/4HANA holds your orders, stock and deliveries. The systems around it run the warehouse, the trucks, the yard and the trade checks.

Key takeaway: your teams should work better after go-live, not struggle with a new system. That’s true whether you’re planning a brand-new SAP implementation, moving from SAP ECC to S/4HANA, or switching from SAP WM to EWM. According to SAP, ECC mainstream maintenance ends in 2027.

SAP SYSTEM SAP EWM & LGM SAP TM & BN4L SAP Yard Logistics & GTS SAP IBP EWM for large automated warehouses, LGM for smaller sites. Plan loads, pick carriers and send tenders online. Truck tracking and trade checks. Demand and supply planning.
  • SAP EWM & LGMEWM for large automated warehouses, LGM for smaller sites.
  • SAP TM & BN4LPlan loads, pick carriers and send tenders online.
  • SAP Yard Logistics & GTSTruck tracking and trade checks.
  • SAP IBPDemand and supply planning.

Why Do SAP Projects Struggle After Go-Live?

Most SAP projects struggle after go-live because of setup, master data, integrations, process design or training, not because of SAP itself. Here are the signs we see most often in US warehouse, yard and transport operations.

Why Do SAP Projects Struggle After Go-Live?

Manual Workarounds

Teams still use paper or Excel, because the processes were never checked on the warehouse floor.

Stock That Doesn’t Match

System stock and shelf stock don’t match, so inventory accuracy drops. It’s usually an integration error or poor master data.

Freight Planned Outside SAP

Gaps in the SAP TM setup push planners back to spreadsheets. Carriers still get booked by phone.

Trucks Waiting at the Gate

Yard and dock schedules aren’t linked to the warehouse. Trucks sit in line and detention charges pile up.

Export Shipments on Hold

Trade checks aren’t set up in SAP GTS, so shipments leaving the USA wait for documents or approvals.

Automation Out of Sync

Conveyors, shuttles or robots run on their own system, so SAP and the floor don’t agree on what’s where.

Should You Move Off SAP WM or ECC?

Yes, and plan it early. ECC mainstream maintenance ends in 2027, and EWM replaces WM in S/4HANA. A rushed warehouse move is a risky one.

Live, But No Improvement

Testing skipped real volumes and training didn’t fit real job roles. So costs and delays stayed the same.

What Do Our SAP Implementation Services Cover?

We cover the full SAP lifecycle, from assessment and roadmap to new implementation, S/4HANA and EWM migration, integration and data, rescue and stabilization, and support after go-live.

Assessment & Roadmap

We review your sites, processes, data and current SAP setup. You get a plan with scope, timeline and cost, plus a list of what to fix first.

New SAP Implementation

New SAP EWM and SAP TM implementations, plus Yard Logistics, GTS, IBP and LGM. Everything is set up around how your sites really work, and we only build what you need.

S/4HANA & EWM Migration

Moving from SAP ECC to S/4HANA, SAP WM to EWM, or LE-TRA to SAP TM. We plan the data, testing and cutover so shipping keeps going.

Integration & Data

We connect SAP to carriers, warehouse automation (MFS), middleware and finance. Master data gets cleaned up before it turns into stock errors.

Rescue & Stabilization

Already live and still struggling? We find what’s wrong in the setup, data or training and fix the biggest problems first.

Support & Improvement

SAP AMS support after go-live. We handle tickets, small changes and upgrades, and keep improving the system as your business changes.

How Does an SAP Implementation Work?

An SAP implementation runs in four phases: discover and design, build and connect, test and go live, then stabilize and improve. Our approach is based on SAP Activate, one team owns the work, and you sign off at the end of every phase.

Discover & Design

Fit-to-standard workshops, process checks on your warehouse floor, and early calls like embedded vs decentralized EWM or greenfield vs brownfield.

Build & Connect

We set up the SAP landscape, build only what you need, and connect carriers, automation, middleware and finance.

Test & Go Live

Testing with real volumes, several test cycles and clear go/no-go rules, so shipping doesn’t stop on go-live day.

Stabilize & Improve

Hypercare until things are stable. After that comes documentation, extra training and a full handover to your team.

Why Choose SCM Champs as Your SAP Implementation Partner?

Choose SCM Champs if you need an SAP Silver Partner that focuses on supply chain and knows how US warehouses, yards and carriers actually work. We work with manufacturers, distributors, retailers and 3PLs.

Supply Chain Focus

We start with your goals: service levels, cost, capacity, inventory and growth. The SAP processes are shaped around those, not the other way around.

We Know the Floor

Our consultants know warehouses, yards, transport and carriers from real projects. So the SAP design fits how your team works every day.

Full Landscape Expertise

We connect SAP EWM, TM, Yard Logistics, GTS, BN4L and S/4HANA, so processes run across the supply chain instead of each system working alone.

Go-Live Without Disruption

Data migration, testing, cutover and team readiness are all planned carefully. Your daily operations keep running while you move.

With You Through Hypercare

We stay after go-live to fix issues fast, stabilize processes and keep your KPIs on track.

Knowledge Transfer to Your Team

Our people work side by side with yours and document the key processes. After handover, you can run SAP on your own.

Should You Start or Fix an SAP Project?

Start with a free assessment, whether you’re starting fresh, moving off SAP ECC or WM, or already live and not seeing results.

Book a Free Assessment

What Can a Well-Run SAP Implementation Deliver?

A well-run SAP implementation delivers higher warehouse productivity, lower freight cost, faster yard and trade operations, better planning and more on-time, in-full orders. Every project starts with clear supply chain KPIs that we track through go-live and hypercare.

  • Warehouse ProductivityMore picks per hour, better inventory accuracy and a shorter dock-to-stock time.
  • Lower Freight CostBetter load planning, the right carrier each time and faster freight invoice checks.
  • Faster Yard and Trade OperationsLess truck waiting, fewer detention charges and fewer shipments held at customs.
  • Better PlanningMore accurate forecasts, healthier stock levels and shorter planning cycles.
  • More On-Time, In-Full OrdersWarehouse, yard and transport work from the same plan, so more orders ship on time and complete (OTIF).
  • How Long Does SAP EWM Take?Based on our projects, a single-site SAP EWM implementation usually takes 3-4 months. Cost and timeline depend on scope, number of sites, automation, integrations and data quality. You get a scoped estimate after the assessment.

Talk to Us