{"id":2159,"date":"2026-08-20T08:12:31","date_gmt":"2026-08-20T08:12:31","guid":{"rendered":"https:\/\/www.scmchamps.com\/blog\/?p=2159"},"modified":"2026-09-12T13:03:22","modified_gmt":"2026-09-12T13:03:22","slug":"sap-tm-s4hana-rfp","status":"publish","type":"post","link":"https:\/\/www.scmchamps.com\/blog\/sap-tm-s4hana-rfp\/","title":{"rendered":"SAP TM S\/4HANA Implementation RFP\/RFQ: Criteria That Decide the Project Before It Starts"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Five implementation partners receive the same SAP TM S\/4HANA RFP. Five proposals come back. One quotes 14 months, one quotes 26, and the gap between the highest and lowest price is more than double. All five say the same thing: yes, we can do this.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">At that point, most teams assume the difference sits with the partners. Usually it doesn&#8217;t. It sits in the RFP.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Most SAP TM projects that go wrong were already going wrong on the day the contract was signed. The design wasn&#8217;t bad. The consultants weren&#8217;t bad. The RFP simply never asked the questions that mattered.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Some things a good implementation partner can still fix later. Messy master data, a weak cutover plan, and a commercial model that needs renegotiating painfully but is survivable.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This article is about the other kind.<\/span><\/p>\n<h2><b>What actually decides an SAP TM project&#8217;s outcome?<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The five RFP decisions that create the most implementation risk are <\/span><b>architecture, scope and volumes, partner capability, carrier onboarding ownership, and client-side availability.<\/b><\/p>\n<p><span style=\"font-weight: 400;\">None of these can be technically unaltered after signature. But by the time they surface, the architecture is built, the budget is approved and the team is hired, so changing them has real cost, schedule and contractual consequences. This is what makes them different from the gaps you can take in delivery.<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td><b>RFP gap<\/b><\/td>\n<td><b>How recoverable is it after signing?<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Master data quality<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Recoverable \u2014 ugly, but manageable<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Cutover approach<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Recoverable \u2014 can be designed later<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Commercial model<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Partly \u2014 renegotiable, with effort<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Architecture and licence position<\/span><\/td>\n<td><b>Very difficult and costly<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Scope without volumes and modes<\/span><\/td>\n<td><b>Very difficult and costly<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Partner capability mismatch<\/span><\/td>\n<td><b>Very difficult and costly<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Carrier onboarding ownership<\/span><\/td>\n<td><b>Very difficult and costly<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Client-side resource commitment<\/span><\/td>\n<td><b>Very difficult and costly<\/b><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span style=\"font-weight: 400;\">The bottom five rows are what the rest of this article covers.<\/span><\/p>\n<p><b>At SCM Champs, we&#8217;ve seen all five turn up in RFPs that looked completely professional on paper well formatted, properly governed, signed off by three committees, and still missing the questions that decided the project.<\/b><\/p>\n<h2><b>Criteria 1 \u2014 Have you answered the architecture question or left it to the bidders?<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">If your RFP doesn&#8217;t state whether you want Transportation Management <\/span><b>embedded<\/b><span style=\"font-weight: 400;\"> in SAP S\/4HANA or deployed as a <\/span><b>separate (sidecar) system<\/b><span style=\"font-weight: 400;\">, each bidder will assume a different answer. Your quotes will then not be comparable, and no amount of procurement analysis will make them comparable.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Three decisions hide inside this one question.<\/span><\/p>\n<h3><b>Embedded TM or a separate TM deployment<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">With <\/span><b>embedded TM<\/b><span style=\"font-weight: 400;\">, transportation runs inside the same SAP S\/4HANA system as sales, purchasing and finance. The integration sits within a single SAP landscape rather than between two separate systems, which usually means lower integration effort. The trade-off is coupling: transportation follows the S\/4HANA upgrade cycle, and planning load shares a system with your financial close.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A <\/span><b>separate TM deployment<\/b><span style=\"font-weight: 400;\"> can be relevant when transportation has its own sizing, integration or lifecycle requirements, for example, in more complex landscapes, or where multiple source systems feed transportation. The trade-off is that you now own the integration between them.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Neither option is universally right. The decision depends on your landscape, release, integration needs, operational model and sizing. But leaving it open in the RFP is always wrong.<\/span><\/p>\n<h3><b>Your licence position<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Do not assume that the<\/span><a href=\"https:\/\/www.scmchamps.com\/blog\/sap-transportation-management-to-streamline-your-business-operations\/\"> <b>SAP TM<\/b><\/a><span style=\"font-weight: 400;\"> functionality described in your RFP is covered by your existing entitlement. Scope items such as optimiser-based planning, charge management and settlement can carry different licensing implications depending on release and edition.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Ask SAP to confirm, in writing, the licence position required for your exact release and your exact scope <\/span><b>before<\/b><span style=\"font-weight: 400;\"> the RFP is issued. Discovering a licensing gap after partner selection weakens the business case before configuration has even started, and nobody in the room will feel responsible for it.<\/span><\/p>\n<h3><b>Advanced Shipping and Receiving, or classic delivery-based integration<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">If SAP EWM is in scope, this fork changes the warehouse-to-transport integration design significantly. Most buyers have never heard of it at RFP stage. Bidders who know it will scope it; bidders who don&#8217;t will scope the classic delivery-based flow. Two different projects, one RFP.<\/span><\/p>\n<p><b>The symptom:<\/b><span style=\"font-weight: 400;\"> three bids with a 2.5x price gap, and nobody in the room can explain why.<\/span><\/p>\n<p><b>What to state in your RFP:<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The deployment option you have selected or a clear request for each bidder to recommend one, with reasoning and cost impact for both.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Your confirmed licence position, plus a requirement that bidders flag any scope item needing entitlement beyond it.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">If SAP EWM is in scope, whether Advanced Shipping and Receiving is in or out.<\/span><\/li>\n<\/ul>\n<h2><b>Criteria 2 \u2014 Does your scope describe transport reality or just module names?<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">&#8220;Transportation planning, freight order management, charge management, and settlement&#8221; is not a scope. It&#8217;s a table of contents. No partner can build an honest estimate from it, which means every number you receive will be a guess with a margin wrapped around it.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Your scope section needs to answer these in the RFP itself:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Modes.<\/b><span style=\"font-weight: 400;\"> FTL, LTL, parcel, ocean, air, rail, and intermodal, which are in, and which are explicitly out?<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Direction.<\/b><span style=\"font-weight: 400;\"> Inbound, outbound, stock transfer orders, returns.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Fleet model.<\/b><span style=\"font-weight: 400;\"> Own fleet, carrier-based, or both? Is driver and vehicle scheduling in scope?<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Volumes.<\/b><span style=\"font-weight: 400;\"> Freight units per day, average items per freight unit, peak-to-average ratio, planning horizon.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Planning complexity.<\/b><span style=\"font-weight: 400;\"> Time windows, incompatibilities, capacity rules, consolidation logic, and number of planning strategies. This matters as much as volume: 4,000 freight units with hard constraints is a harder planning problem than 10,000 simple ones.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Geography.<\/b><span style=\"font-weight: 400;\"> Countries in scope, and whether the transport process is genuinely the same in each or the same only on the slide.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Special handling.<\/b><span style=\"font-weight: 400;\"> Dangerous goods, temperature control, and customs via SAP GTS, where relevant.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Volume and constraint density together shape the design of cost and planning profiles, optimiser behaviour and run times. Without them, nobody can size the planning work.<\/span><\/p>\n<p><b>The symptom:<\/b><span style=\"font-weight: 400;\"> with no volumes, bidders either pad the price or absorb the risk,\u00a0 and you pay for it later as change requests.<\/span><\/p>\n<h2><b>Criteria 3 \u2014 Are you testing SAP TM capability or just SAP S\/4HANA credentials?<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">A partner with 40<\/span><a href=\"https:\/\/www.scmchamps.com\/sap-modules\/s4-hana\"> <b>SAP S\/4HANA<\/b><\/a><span style=\"font-weight: 400;\"> projects behind them may have delivered very few genuine SAP TM optimiser builds. These are different skills, held by different people, and most RFP evaluation sheets never separate them.<\/span><\/p>\n<h3><b>The optimiser is where SAP TM projects quietly fail<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">VSR (Vehicle Scheduling and Routing) optimisation is not configuration. It&#8217;s cost profiles, planning profiles, constraint sets, incompatibility settings, capacity and time windows, and planning horizons, then tuning all of it against real transport data until the results make sense to people who have been planning loads by hand for fifteen years.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The failure has a pattern. The system goes live. It proposes loads the planners think are wrong. The planners start overriding manually first the odd one, then most of them. Within a few months, an expensive transportation management system is being used as a freight-order printer, and the savings in the business case never appear.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Nobody calls this a failed project. They call it an adoption issue.<\/span><\/p>\n<h3><b>Charge management and settlement are often underestimated<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Transportation Charge Management is not a small module bolted on at the end. It covers rate tables, scales, calculation sheets, charge types, surcharges, accessorials, multi-currency handling, agreement validity, accruals, freight settlement documents, self-billing and invoice verification with tolerances and dispute handling.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">And then there&#8217;s the part no RFP mentions: today, those rates often live across hundreds of spreadsheets, in inconsistent formats, with side agreements that were never written down anywhere.<\/span><\/p>\n<p><b>The symptom:<\/b><span style=\"font-weight: 400;\"> when freight accruals don&#8217;t reconcile in FI, finance stops trusting the system, and credibility is lost in hypercare, not at go-live.<\/span><\/p>\n<p><b>What to state in your RFP:<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Ask for optimiser references by project, mode profile and volume band, not a slide of company logos.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Ask bidders to walk through one of <\/span><i><span style=\"font-weight: 400;\">your<\/span><\/i><span style=\"font-weight: 400;\"> real rate structures during orals, not a prepared demo table.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Ask which named consultant will own planning design and which will own charge management design. They are rarely the same person, and both need to be good.<\/span><\/li>\n<\/ul>\n<h2><b>Criteria 4 \u2014 Who owns carrier onboarding?<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">In most RFPs, nobody. It sits in the gap between &#8220;customer responsibility&#8221; and &#8220;partner responsibility&#8221; until the week it lands on the critical path.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Do the arithmetic before you publish. Sixty carriers, three message types each typically tendering status and invoicing, multiplied by how quickly each carrier actually responds to your emails. In practice this means EDI-based messaging in North America, comparable EDIFACT messaging in Europe, or onboarding through SAP Business Network for Logistics.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Then add the mid-sized regional carrier with no EDI capability at all, who takes loads by phone today and has no intention of changing. Multiply by however many of those you have.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">That is a project inside your project, and it isn&#8217;t really a technical project. It&#8217;s a supplier management project with a technical component, which is exactly why IT teams underestimate it.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The integration points RFPs also routinely forget: geocoding and map or routing services, toll and transit-time engines, telematics for tracking, customs through SAP GTS, freight audit and pay, and whatever visibility platform the business already uses.<\/span><\/p>\n<p><b>What to state in your RFP:<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The carrier count, split into EDI-capable and not.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The message types required per carrier tier.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The named owner of carrier communication \u2014 and who chases a carrier that has gone silent for three weeks.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Whether onboarding is priced per carrier or as a fixed pool, so commercial exposure is visible on both sides.<\/span><\/li>\n<\/ul>\n<h2><b>Criteria 5 \u2014 Have you written down your own obligations?<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Most RFPs demand named partner resources, CVs, rate cards and replacement clauses \u2014 then say nothing at all about the buyer&#8217;s own people.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">SAP TM design depends on the people who currently do the work: transport planners, dispatchers, and freight settlement clerks. These are not project people. They are moving real trucks today, and they will still be moving them throughout your Explore phase.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Fit-to-standard workshops need them in the room. Test cycles need them. Training needs them. When nobody has arranged backfill, the pattern is predictable \u2014 workshops get rescheduled, design decisions get taken by people without operational authority, and testing gets thin because the only person who understands the real rate exceptions is on the phone with a carrier.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Then the timeline slips, and it looks like the partner&#8217;s fault.<\/span><\/p>\n<p><b>The symptom:<\/b><span style=\"font-weight: 400;\"> a common contributor to missed go-live dates, and almost completely invisible in a standard RFP.<\/span><\/p>\n<p><b>What to state in your RFP:<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Named client-side process owners for planning, execution and settlement.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The percentage of their time committed, phase by phase across SAP Activate.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Confirmed backfill arrangements for the operational roles you&#8217;re pulling in.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Who has authority to sign off on a design decision, and how quickly.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">In our experience, the projects that run smoothly are the ones where this section existed in the RFP \u2014 not the ones where it was promised verbally during orals.<\/span><\/p>\n<h2><b>How to score the bids so you don&#8217;t pick the wrong partner<\/b><\/h2>\n<p><b>Don&#8217;t let price dominate the scorecard.<\/b><span style=\"font-weight: 400;\"> On a high-complexity SAP TM programme, capability, solution fit, delivery team and stated assumptions should carry substantial weight alongside commercials. Agree the weighting before bids arrive, not after you&#8217;ve seen the numbers.<\/span><\/p>\n<p><b>Match references to your reality.<\/b><span style=\"font-weight: 400;\"> Chemicals with dangerous goods are not retail parcels; they are not automotive milk-runs. Ask for references with your modes, your volume band and your planning complexity \u2014 then actually call them.<\/span><\/p>\n<p><b>Demand assumptions in writing.<\/b><span style=\"font-weight: 400;\"> This may be the highest-value question in the whole RFP: don&#8217;t only ask what is included; ask what the partner assumes <\/span><i><span style=\"font-weight: 400;\">you<\/span><\/i><span style=\"font-weight: 400;\"> will provide. &#8220;Customer provides clean master data.&#8221; &#8220;Integration development excluded.&#8221; &#8220;Customer provides testing resources.&#8221; Each of those sentences can move the real project cost significantly, and each is usually buried on page 41.<\/span><\/p>\n<p><b>Demo on your data.<\/b><span style=\"font-weight: 400;\"> A sandbox with five shipments proves nothing. Give shortlisted bidders a small extract of real locations, lanes and rates, and watch what they do with it.<\/span><\/p>\n<p><b>Lock the named team.<\/b><span style=\"font-weight: 400;\"> The A-team presents at orals; the B-team often delivers. Name key roles in the contract, with notice periods and approval rights over any replacement.<\/span><\/p>\n<p><b>Match the commercial model to scope maturity.<\/b><span style=\"font-weight: 400;\"> A fixed price on a vague scope invites a change-request war. A phased model often works better: time-and-materials or capped for Explore and fit-to-standard, fixed price for Realise once the design is frozen and signed.<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td><b>Compare on<\/b><\/td>\n<td><b>The question to ask every bidder<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Scope<\/span><\/td>\n<td><span style=\"font-weight: 400;\">What exactly is in, and what is explicitly out?<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Architecture<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Embedded or separate \u2014 and what does that assume about our licence?<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Integration<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Which interfaces are priced, and who builds each one?<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Carrier onboarding<\/span><\/td>\n<td><span style=\"font-weight: 400;\">How many carriers, and who does the chasing?<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Resources<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Who actually delivers, and are they named in the contract?<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Timeline<\/span><\/td>\n<td><span style=\"font-weight: 400;\">What client-side availability does your plan assume?<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Assumptions<\/span><\/td>\n<td><span style=\"font-weight: 400;\">What are you expecting us to provide?<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Commercials<\/span><\/td>\n<td><span style=\"font-weight: 400;\">What is fixed, what is variable, and what triggers a change request?<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><b>A quick checklist before you publish your SAP TM RFP<\/b><\/h2>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Have you stated whether TM will be embedded in SAP S\/4HANA or deployed separately?<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Have you confirmed your licence position with SAP in writing for your exact release and scope?<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">If SAP EWM is in scope, have you stated whether Advanced Shipping and Receiving is in or out?<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Have you listed the transport modes in scope and the ones explicitly excluded?<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Have you given daily freight unit volumes and your peak-to-average ratio?<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Have you described your planning constraints, not just your volumes?<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Have you stated your own fleet, 3PL or both \u2014 and whether driver scheduling is included?<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Have you listed every integration point with a named owner beside each one?<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Have you given the carrier count, split into EDI-capable and not?<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Have you named who chases a carrier that stops responding?<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Have you named your own process owners for planning, execution and settlement?<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Have you confirmed backfill for the operational staff you&#8217;re pulling into workshops?<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Have you asked each bidder to identify their assumptions, exclusions and likely change-request triggers?<\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">If more than three are left unanswered, then the RFP isn&#8217;t ready to go out.<\/span><\/p>\n<h2><b>Frequently asked questions<\/b><\/h2>\n<p><b>What is the difference between embedded TM and sidecar TM in SAP S\/4HANA?<\/b><span style=\"font-weight: 400;\"> Embedded TM runs inside the same SAP S\/4HANA system as sales, purchasing and finance, so integration stays within one landscape. A separate (sidecar) deployment runs as its own system with independent sizing and lifecycle, which can suit complex landscapes or multiple source systems \u2014 but you then own the integration between them.<\/span><\/p>\n<p><b>Do we need a full SAP TM licence, or is basic shipping enough?<\/b><span style=\"font-weight: 400;\"> Don&#8217;t assume your existing entitlement covers the scope in your RFP. Licensing implications for planning, charge management and settlement can vary by release and edition. Before you release the RFP, get a written confirmation from SAP regarding the licensing position needed for your specific release and scope.<\/span><\/p>\n<p><b>How much time does SAP TM and S\/4HANA implementation take?<\/b><span style=\"font-weight: 400;\"> An SAP TM S\/4HANA implementation usually takes 6-12 months. It depends much more on scope than on company size. A single country, single-mode rollout with simple charge management is much faster than a multi-country, multi-mode programme with optimiser tuning, EWM integration and large-scale carrier onboarding. Any timeline quoted without volumes and modes is a guess.<\/span><\/p>\n<p><b>What should an SAP TM implementation RFP include at minimum?<\/b><span style=\"font-weight: 400;\"> The deployment option, your confirmed licence position, modes and directions in scope, daily freight unit volumes with peak ratio, planning constraints, a full integration list with named owners, carrier counts and message types, your named client-side team with backfill confirmed, and a requirement for bidders to state assumptions in writing.<\/span><\/p>\n<p><b>How should you compare SAP TM implementation partner proposals?<\/b><span style=\"font-weight: 400;\"> Compare on the same eight dimensions for every bidder: scope in and out, architecture assumptions, priced interfaces, carrier onboarding ownership, named delivery resources, timeline assumptions, stated assumptions and exclusions, and what is fixed versus variable commercially. Comparing on price alone compares different projects.<\/span><\/p>\n<p><b>What should an SAP TM RFP say about carrier onboarding?<\/b><span style=\"font-weight: 400;\"> State the total carrier count split by EDI capability, the message types required per carrier tier \u2014 typically tendering, status and invoicing, such as EDI 204\/214\/210 or EDIFACT IFTMIN\/IFTSTA\/INVOIC \u2014 the named owner on each side, the escalation route for unresponsive carriers, and whether onboarding is priced per carrier or as a pool.<\/span><\/p>\n<h2><b>The one thing worth remembering<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">A good implementation partner can rescue dirty master data. They can rebuild a weak cutover plan. They can absorb a difficult commercial model and still deliver.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">What they can&#8217;t do cheaply is undo an architecture chosen without the facts, an estimate built on missing volumes, a capability gap in optimizer or settlement design, carrier onboarding that nobody owned, or a client team that was never actually available. Those decisions are all made before the project starts \u2014 which is precisely why they decide it.<\/span><\/p>\n<h2><b>How SCM Champs Helps Before You Issue the RFP<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Almost everything in this article has to be decided before an implementation partner is formally involved. That&#8217;s an awkward moment for most teams: the decisions are technical, the consequences are commercial, and the people best placed to advise you are often the same people who will later bid for the work.<\/span><\/p>\n<p><a href=\"https:\/\/www.businesswire.com\/news\/home\/20260627456050\/en\/SCM-Champs-Inc.-Earns-SAP-Partner-Recognition-Strengthening-End-to-End-Supply-Chain-Services\" target=\"_blank\" rel=\"noopener\"><b>SCM Champs<\/b><\/a><span style=\"font-weight: 400;\"> works with supply chain and IT teams at exactly that stage. We review the inputs that shape the bids \u2014 architecture and licence position, scope and volumes, planning complexity, the integration landscape, carrier onboarding ownership, the capability you&#8217;re actually testing for, your own side&#8217;s responsibilities, and where the commercial exposure sits.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The aim isn&#8217;t to write the RFP for you. It&#8217;s to make the requirements clear before you ask anyone to price them, so hidden assumptions surface early and the proposals you receive are genuinely comparable.<\/span><\/p>\n<p><b>Preparing an SAP TM S\/4HANA RFP?<\/b><span style=\"font-weight: 400;\"> An independent review before it goes to market is a short exercise \u2014 and the last point at which anything can still be changed cheaply.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Five implementation partners receive the same SAP TM S\/4HANA RFP. Five proposals come back. One&#8230;<\/p>\n","protected":false},"author":1,"featured_media":2160,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[267,7],"class_list":["post-2159","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized","tag-sap-s-4hana-supply-chain-implementation","tag-sap-tm"],"_links":{"self":[{"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/posts\/2159","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/comments?post=2159"}],"version-history":[{"count":4,"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/posts\/2159\/revisions"}],"predecessor-version":[{"id":2251,"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/posts\/2159\/revisions\/2251"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/media\/2160"}],"wp:attachment":[{"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/media?parent=2159"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/categories?post=2159"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/tags?post=2159"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}