{"id":1928,"date":"2026-06-12T13:56:21","date_gmt":"2026-06-12T13:56:21","guid":{"rendered":"https:\/\/www.scmchamps.com\/blog\/?p=1928"},"modified":"2026-09-16T09:25:49","modified_gmt":"2026-09-16T09:25:49","slug":"avoid-dscsa-2026-shipment-holds","status":"publish","type":"post","link":"https:\/\/www.scmchamps.com\/blog\/avoid-dscsa-2026-shipment-holds\/","title":{"rendered":"DSCSA 2026 Is Closer Than You Think \u2014 Here Is Why SAP ATTP and EWM Are the Only Answer Pharma Supply Chains Can Rely On"},"content":{"rendered":"<p><b>DSCSA 2026 Is Closer Than You Think. Here Is Why SAP ATTP and EWM Are the Only Answer Pharma Supply Chains Can Rely On<\/b><\/p>\n<p><span style=\"font-weight: 400;\">In November 2026, the DSCSA\u2019s full interoperability requirements go live. That means every unit of prescription medication in the U.S. must be fully traceable at the package level, with real-time verification across the entire supply chain. For pharma executives and supply chain leaders, waiting means shipment holds and eventually revenue loss and risk of compliance penalties.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">What can help avoid this is an integrated ecosystem where SAP ATTP and SAP EWM work together while functioning as separate systems. While both systems hold different responsibilities, continuous exchange of information helps ensure that the warehouse activities and pharmaceutical traceability remain aligned.\u00a0\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">While SAP ATTP manages compliance-related data and pharmaceutical traceability, SAP EWM manages physical activities, movement, and execution across the warehouse environments.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Based on the existing SAP landscape and deployment model, SAP ATTP can be integrated at clients&#8217; environments. Success depends on how well it is integrated to improve picking, packing, movement, and shipping. Relevant serialization and traceability records are crucial to ensure that only compliance data is aligned with what is actually happening in the real warehouse environment.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Partner with SCM Champs and connect with SAP supply chain experts. The team helps ensure SAP systems are properly implemented as per the business requirements. They also ensure to meet the regulatory requirements and avoid disputes, gaps, and challenges later on.\u00a0<\/span><\/p>\n<h2><b>Is Your Pharmaceutical Supply Chain System Ready for DSCSA US in 2026<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Companies must focus on three operational realities that every pharma business in the US must consider.\u00a0\u00a0<\/span><\/p>\n<p><b>Interoperability:<\/b><span style=\"font-weight: 400;\"> You can not just serialize your own products. The system must exchange data with all stakeholders across the supply chain network, like manufacturers, wholesalers, trading partners, 3PLs, and carrier partners seamlessly and in real time.<\/span><\/p>\n<p><b>Tracking and Traceability: <\/b><span style=\"font-weight: 400;\">Every pallet and Handling Unit (HU) must be tracked from production to its shipment. Manual workarounds can slow down the process.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Verification becomes instant. Requests for product verification must be handled in seconds, with full serialization data at your fingertips. If you can\u2019t respond within the required window, that product is effectively quarantined.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In business terms, the stakes are brutal. A single failed verification request can hold up a shipment worth millions. Persistent non-compliance puts your licenses at risk, erodes trading partner trust, and all but guarantees a recall process that\u2019s slow, expensive, and public. DSCSA 2026 compliance isn\u2019t an IT project; it\u2019s the backbone of your entire distribution capability.<\/span><\/p>\n<h2><b>The Real Problems Pharma Companies Are Facing Right Now<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">I\u2019ve seen the ground reality in pharma warehouses and serialization programs. The issues aren\u2019t theoretical \u2014 they show up every day in production environments, and they directly threaten DSCSA 2026 compliance readiness.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Serialization data mismatches between systems. You\u2019d be surprised how often the serial number that ATTP holds doesn\u2019t match what the warehouse system shows after a repackaging or rework operation. The result? Shipments get blocked for verification failure, and nobody knows why until someone digs through logs.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Warehouse execution not aligned with compliance systems. In real operations, picking and packing teams are under immense time pressure. If SAP EWM isn\u2019t properly configured \u2014 including Handling Unit Management, serial number profiles, and pack station process types \u2014 to enforce aggregation rules and capture serial numbers accurately at every touchpoint, you end up with incomplete parent-child relationships. The ATTP thinks a case contains 10 units; the physical case has 9. That\u2019s a compliance gap and a potential audit finding.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Failed verification requests that kill order flow. In the DSCSA interoperability model, downstream verification requests flow through Verification Router Service networks \u2014 industry platforms connecting trading partners for product verification. ATTP integrates with specific VRS providers, and that integration requires vendor-specific configuration and connectivity agreements \u2014 it does not happen automatically. If your ATTP isn\u2019t properly connected or the serialization data isn\u2019t current, the sale stops. In a high-volume environment, even a 1% failure rate creates daily chaos.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">EPCIS data inconsistencies across partners. Different CMOs and CPOs often generate EPCIS files with slightly different formats, timestamps, or event types. Without a robust data governance layer, your ATTP ends up storing events that don\u2019t link properly. Downstream, it looks like a chain-of-custody break.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Aggregation errors that unwind trust. When cases are decommissioned, split, or re-aggregated at a 3PL, manual processes creep in. One wrong barcode scan, and the aggregated serialization data no longer reflects reality. By the time the product reaches the dispenser, the digital pedigree is unreliable.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">These aren\u2019t system design flaws \u2014 they\u2019re the everyday friction between compliance requirements and real-world logistics. And they\u2019re exactly where serialization failures start.<\/span><\/p>\n<h2><b>Where Most Companies Fail in Serialization (And What It Costs)<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">It\u2019s not a single misstep that derails a pharma serialization program. Usually, there\u2019s a cluster of failure points that compound over time.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">System gaps: ATTP misunderstood as a standalone tool. It\u2019s important to be clear on the architecture: SAP ATTP is not a standalone product in the traditional sense \u2014 it is available as an on-premises add-on within SAP S\/4HANA or SAP ERP (ECC), and increasingly as a cloud deployment on SAP BTP, with specific version dependencies and integration requirements either way. Many organisations deploy ATTP without fully connecting it to EWM, quality systems, and partner gateways. The result is an expensive logbook \u2014 not the real-time compliance engine it\u2019s meant to be.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Warehouse execution gaps: EWM misalignment. Some sites still run legacy WMS or use SAP EWM without activating the serialization-specific processes it requires \u2014 Handling Unit Management, serial number profiles, pack station warehouse process types, and EPCIS outbound message generation. The moment an exception occurs \u2014 damaged goods, manual rework \u2014 serial numbers aren\u2019t captured properly, ATTP data becomes stale, and pharma serialization compliance breaks at the most critical point: the physical handoff.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Data synchronization issues between internal and external systems. Even with the right tools, master data mismatches between ATTP, EWM, and trading partner systems cause serialization failures. A GTIN that\u2019s one character off in a CMO\u2019s EPCIS message can block an entire shipment.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Partner ecosystem failures. You can be fully compliant internally and still fail because a contract packager sends bad data or a wholesaler\u2019s system doesn\u2019t support the latest DSCSA 2026 requirements. Without a deliberate partner testing and onboarding strategy, and without validating connectivity through SAP-supported integration channels, your compliance is only as strong as the weakest link.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">What does failure cost? Shipment holds that delay revenue recognition, fines that reach into the hundreds of thousands per incident, and a quiet but devastating loss of customer trust. When a large retail pharmacy chain labels you a non-compliant supplier, you don\u2019t just lose one order \u2014 you risk losing shelf space permanently.<\/span><\/p>\n<h2><b>SAP ATTP: The Compliance Orchestration Layer You Actually Need<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Think of SAP ATTP as the central nervous system of your serialization and compliance efforts. Available as an on-premises add-on within SAP S\/4HANA or SAP ERP, or as a cloud deployment on SAP Business Technology Platform depending on your organisation\u2019s landscape, it\u2019s not just a database of serial numbers \u2014 it\u2019s the platform that makes DSCSA 2026 compliance operational.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">To understand it correctly: serial number commissioning \u2014 the actual creation and assignment of serial numbers \u2014 happens within SAP S\/4HANA or SAP ERP, typically through production orders or goods movement processes. ATTP receives, governs, and manages that serialization data, providing the track-and-trace repository, compliance reporting, and verification that the regulation demands.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In practice, SAP ATTP handles four things that matter most:<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Serialization governance at scale. It governs serial numbers commissioned through S\/4HANA or ERP across all your products and markets. You get a single source of truth for every serialized item you\u2019ve ever produced or shipped.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Compliance reporting that\u2019s always audit-ready. ATTP maintains the event records and transaction histories regulators expect. When an FDA investigator shows up, you\u2019re not scrambling through spreadsheets \u2014 you pull a clean, traceable record.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Verification handling through VRS networks. When a dispenser or wholesaler initiates a product verification request, that request flows through a Verification Router Service network. ATTP integrates with specific VRS providers \u2014 and that integration requires vendor-specific configuration and connectivity agreements on your side. This networked exchange is how DSCSA verification actually works in practice, and getting it right in your implementation is critical.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">EPCIS event management that keeps partners connected. SAP EWM generates warehouse-level EPCIS events during physical activities and flows into ATTP.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">SAP ATTP then acts as the compliance orchestrator to ensure that the trackable and traceable data reaches the right partner across the supply chain on time.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Thus, the right deployment and integration of SAP ATTP in the existing landscape is crucial, along with quality data.\u00a0<\/span><\/p>\n<h2><b>SAP EWM: Where Compliance Hits the Warehouse Floor<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Even the smartest compliance orchestration layer is useless if the hands don\u2019t execute correctly. That\u2019s where SAP EWM enters the picture. In pharma distribution, the warehouse is where serialization failures most often begin \u2014 and where they can be prevented.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">SAP EWM, when properly configured for serialized operations, ensures three non-negotiable outcomes:<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Correct aggregation, every time. As products are packed into cases and pallets, EWM enforces the serial number parent-child relationship through Handling Unit Management. A worker can\u2019t close a handling unit unless every required serial number is scanned. No missing data, no phantom units.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Accurate picking and packing that respects serialization rules. Depending on your serial number profile configuration, EWM enforces serial number capture either at the pick step or at pack confirmation \u2014 the critical point where the physical and digital records must align exactly. The downstream recipient expects precise identifiers, and ATTP must reflect exactly what was physically packed.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Real-time EPCIS event generation that feeds ATTP instantly. Every movement, pack, unpack, or shipping event in EWM generates a warehouse-level EPCIS event that flows directly into ATTP. There\u2019s no batch upload lag and no window for human error to create a gap.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Where many operations stumble is assuming that a basic WMS can handle serialization with some tweaks. Without properly activated EWM serialization processes, you\u2019re asking warehouse staff to manually maintain compliance data. The moment someone says \u201cI\u2019ll log those serial numbers later,\u201d you\u2019ve already created a serialization failure waiting to be discovered.<\/span><\/p>\n<h2><b>Why SAP ATTP + EWM Integration Isn\u2019t Optional \u2014 It\u2019s the Whole Game<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">You can have ATTP deployed, and EWM running and still find yourself completely non-compliant. This happens when both systems are implemented without proper integration \u2014 and it happens more often than the industry talks about.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In the SAP architecture, this integration is typically enabled through SAP Integration Suite, which provides standard integration content \u2014 including iFlows and message mappings \u2014 that connects EWM, ATTP, and S\/4HANA in real time.\u00a0<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">For on-premises landscapes, SAP mechanisms such as RFC\/BAPI integration are useful. For event-driven architecture, SAP Event Mesh is relevant.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">The right approach is to-<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">First analyse the existing SAP architecture<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Integration and interface<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">business goals and requirement<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">However, connecting SAP ATTP with SAP EWM and SAP S\/4HANA is not an automatic exercise.\u00a0\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Data mapping, interfaces, events and error handling, verification, validation, and testing all need to be analysed and designed appropriately. Each activity must be considered from the start, as they directly impact the budget and timeline.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">When integration testing is done properly, the traceability data and warehouse execution are aligned appropriately. This results in fewer manual reconciliations and reliable transaction data, serialization, and enhanced visibility across product movement. It helps strengthen support for DSCSA-related traceability processes.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Data synchronises in real time when EWM generates a commissioning or aggregation event; ATTP knows immediately. End-to-end traceability requires no manual stitching \u2014 every event from production line to patient is captured and linked. Exception management actually works \u2014 damaged goods, case splits, returns \u2014 every exception automatically updates both the physical and digital records, keeping the chain of trust intact.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A simple way to remember it: ATTP is the compliance orchestration layer; EWM is the hands that execute. If the orchestration layer says one thing and the hands do another, you don\u2019t have a functioning supply chain. You have an incident report.<\/span><\/p>\n<h2><b>Step-by-Step Blueprint for DSCSA Readiness: 2026<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Here is the roadmap for real implementation of DSCSA Readiness-\u00a0\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Current system assessment. Document exactly what you have today \u2014 which serialization systems, which SAP versions, how EPCIS data flows, and where manual interventions exist. Be brutally honest.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Gap analysis against DSCSA 2026 requirements. Map every current capability to the specific interoperability, verification, and data exchange mandates. Where does your environment fall short?<\/span><\/p>\n<p><span style=\"font-weight: 400;\">ATTP implementation or optimisation within your landscape. Whether you are deploying ATTP as an on-premises add-on or as a cloud solution on SAP BTP, establish it as your central serialization governance layer. If it is already in place, audit its configuration thoroughly \u2014 data retention rules, VRS network connectivity, verification response times, and EPCIS event handling all need to be validated.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">EWM alignment with serialization processes.\u00a0<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Activate Handling Unit Management<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Configure serial number profiles<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Set up pack station warehouse process types<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Enable EPCIS outbound message generation<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Validate the integration layer, be it SAP Integration Suite, SAP Event Mesh, RFC\/BAPI, to connect EWM to ATTP and S\/4HANA. <\/span><span style=\"font-weight: 400;\">This step consistently reveals the most dangerous gaps.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">Integration testing \u2014 the step too many people skip properly. Run end-to-end scenarios with bad data, missing serial numbers, network delays, and EPCIS event deduplication scenarios. Prove that when an exception occurs, both systems react correctly and synchronise accurately.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Partner connectivity validation. Onboard every major trading partner\u2019s EPCIS interface, validate connectivity through SAP-supported integration channels, test ASN and verification message exchanges through your VRS network connections, and fix data formatting mismatches long before go-live.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Mock compliance runs. Simulate a full DSCSA 2026 compliance day \u2014 verification floods, rework events, recall drills \u2014 and measure performance. This isn\u2019t a checkpoint; it\u2019s your confidence builder.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Start now, not in 2026\u2019s second quarter. The organisations that wait will find themselves debugging integration issues while regulators watch.<\/span><\/p>\n<h2><b>How SCM CHAMPS Helps Pharma Companies Avoid the Avoidable<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Over the years, the difference between pharma companies that glide through compliance milestones and those that panic comes down largely to the partner they choose. SCM CHAMPS doesn\u2019t just implement software \u2014 they bring hard-earned expertise from real-world pharma supply chain transformations.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">What makes them different is that they understand the full architecture \u2014 ATTP across both on-premise and BTP cloud deployments, EWM serialization configuration, integration layer setup whether through SAP Integration Suite, RFC\/BAPI, or SAP Event Mesh, and VRS network connectivity \u2014 as a connected system, not as separate workstreams. Their teams have been in the room when aggregation errors almost stopped product launches. That battle-tested insight means they don\u2019t just configure systems \u2014 they align business processes, master data, and partner integration so compliance becomes part of daily operations, not a monthly fire drill.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Because SCM CHAMPS approaches every project with a business-first view, the result isn\u2019t just a technical go-live \u2014 it\u2019s faster compliance readiness, fewer serialization failures, and supply chain teams that genuinely understand how to maintain the system long after the project closes.<\/span><\/p>\n<h2><b>Key Benefits That Decision Makers Actually Care About<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">When ATTP and EWM work together correctly within a properly integrated landscape, the outcomes show up on a balance sheet and an auditor\u2019s report.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Reduced compliance risk. Systemic gaps are closed proactively. You\u2019re not hoping you pass an audit \u2014 you\u2019re ready for it.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Faster product movement through the supply chain. Shipments clear verification checks in real time, so you\u2019re not losing days to manual hold resolution.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Improved supply chain visibility. A live, trusted picture of inventory from factory to pharmacy helps prevent stockouts and overstocking.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Better audit readiness. Documentation is consistent, digital, and instantly retrievable \u2014 saving weeks of prep work and protecting your reputation.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Cost avoidance that\u2019s hard to quantify until you need it. Every avoided shipment hold, penalty, or damaged trading partner relationship is real money kept in the business.<\/span><\/p>\n<h2><b>Common Mistakes That Put Everything at Risk<\/b><\/h2>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Considering SAP ATTP as a standalone tool.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Not analysing the architecture clearly<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Ignoring warehouse processes until the last minute.\u00a0<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">EWM serialization processes must be designed and tested months before go-live, not weeks. You cannot fix serialization errors at the shipping dock.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Underestimating the testing phase. A quick connectivity test isn\u2019t enough. You need stress tests, failure scenario tests, EPCIS deduplication tests, and full data flow validation \u2014 otherwise go-live becomes a cascade of unexpected errors.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Don\u2019t delay DSCSA readiness. It takes months for integration, partner alignment, team training, and compliance planning.\u00a0<\/span><\/p>\n<h2><b>The Window Is Closing. Act With Purpose<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">November 2026 might sound like it\u2019s in the future, but in serialization program terms, it\u2019s tomorrow. Every month you wait compresses the testing window, increases the likelihood of rushed configurations, and multiplies the risk of serialization failures that directly impact revenue and trust.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The organisations that move now \u2014 assessing their SAP landscape honestly, integrating ATTP and EWM through the right connectivity approach for their environment, connecting to VRS networks with proper vendor agreements in place, and partnering with teams who\u2019ve done this before \u2014 won\u2019t just be compliant. They\u2019ll be the partners that dispensers and wholesalers want to do business with, because their supply chain just works.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">If you\u2019re ready to get serious about your DSCSA 2026 compliance journey, having the right conversation today can mean the difference between a smooth transition and a crisis.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Contact <\/span><a href=\"https:\/\/www.scmchamps.com\/\"><b>SCM CHAMPS<\/b><\/a><span style=\"font-weight: 400;\"> to analyse your current situation and ensure that you are DSCSA-compliant-ready.\u00a0\u00a0<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>DSCSA 2026 Is Closer Than You Think. Here Is Why SAP ATTP and EWM Are&#8230;<\/p>\n","protected":false},"author":1,"featured_media":1929,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[39],"tags":[300,301],"class_list":["post-1928","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-sap-ewm","tag-dscsa-2026","tag-dscsa-2026-supply-chain"],"_links":{"self":[{"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/posts\/1928","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/comments?post=1928"}],"version-history":[{"count":4,"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/posts\/1928\/revisions"}],"predecessor-version":[{"id":2301,"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/posts\/1928\/revisions\/2301"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/media\/1929"}],"wp:attachment":[{"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/media?parent=1928"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/categories?post=1928"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/tags?post=1928"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}