{"id":1875,"date":"2026-05-19T11:48:30","date_gmt":"2026-05-19T11:48:30","guid":{"rendered":"https:\/\/www.scmchamps.com\/blog\/?p=1875"},"modified":"2026-05-19T11:48:30","modified_gmt":"2026-05-19T11:48:30","slug":"sap-s4hana-tm-freight-optimization","status":"publish","type":"post","link":"https:\/\/www.scmchamps.com\/blog\/sap-s4hana-tm-freight-optimization\/","title":{"rendered":"How Companies Reduce Freight Costs by Up to 22% Using SAP S\/4HANA TM"},"content":{"rendered":"<h3 data-section-id=\"17ctx0u\" data-start=\"427\" data-end=\"499\">The Freight Problem No One Talks About \u2014 Until It Hits the Numbers<\/h3>\n<p data-start=\"501\" data-end=\"631\">Every quarter, the same report lands on the CFO\u2019s desk. Logistics costs are up again not slightly, but enough to impact margins.<\/p>\n<p data-start=\"633\" data-end=\"808\">The logistics head already knows the reasons. Fuel costs increased. Carriers raised rates. A few urgent shipments went out at premium pricing because planning ran out of time.<\/p>\n<p data-start=\"810\" data-end=\"857\">But knowing the reason doesn\u2019t fix the problem.<\/p>\n<p data-start=\"859\" data-end=\"1168\">Most companies are still planning freight the same way they did years ago using spreadsheets, emails, and phone calls. A planner spends two to three days building a shipment plan that is already outdated before the week ends. One delay, one change, or one rejected carrier\u00a0 and the entire plan falls apart.<\/p>\n<p data-start=\"1170\" data-end=\"1227\"><strong data-start=\"1170\" data-end=\"1227\">This is not a small leak. It is continuous cost loss.<\/strong><\/p>\n<p data-start=\"1229\" data-end=\"1528\">According to the CSCMP State of Logistics Report (2025), U.S. logistics costs reached $2.58 trillion, accounting for 8.8% of GDP\u00a0 now the new normal, not an exception. In manufacturing, a 2026 Xeneta survey found that 94% of companies exceeded their freight budgets, with an average overrun of 10%.<\/p>\n<p data-start=\"1530\" data-end=\"1587\">The real question is not whether freight costs will rise.<\/p>\n<p data-start=\"1589\" data-end=\"1599\">They will.<\/p>\n<p data-start=\"1601\" data-end=\"1699\">The real question is \u2014 <strong data-start=\"1624\" data-end=\"1699\">is your planning process controlling costs, or quietly increasing them?<\/strong><\/p>\n<h3 data-section-id=\"vy2gi9\" data-start=\"1706\" data-end=\"1771\">Freight Is No Longer Just a Cost \u2014 It\u2019s a Business Strategy<\/h3>\n<p data-start=\"1773\" data-end=\"1880\">Freight used to be treated as a routine expense. Negotiate once a year, accept rate increases, and move on.<\/p>\n<p data-start=\"1882\" data-end=\"1912\">That approach no longer works.<\/p>\n<p data-start=\"1914\" data-end=\"2042\">Logistics costs are now consistently higher than pre-pandemic levels. Freight rates are volatile and unpredictable. For example:<\/p>\n<ul data-start=\"2044\" data-end=\"2169\">\n<li data-section-id=\"112ib09\" data-start=\"2044\" data-end=\"2090\">$1,342 per 40-ft container in October 2023<\/li>\n<li data-section-id=\"olnpu7\" data-start=\"2091\" data-end=\"2129\">Jumped to over $5,900 by July 2024<\/li>\n<li data-section-id=\"1fccx58\" data-start=\"2130\" data-end=\"2169\">A 340% increase in less than a year<\/li>\n<\/ul>\n<p data-start=\"2171\" data-end=\"2241\">Even after stabilizing, rates remain significantly higher than before.<\/p>\n<p data-start=\"2243\" data-end=\"2268\">Now multiply this across:<\/p>\n<ul data-start=\"2269\" data-end=\"2378\">\n<li data-section-id=\"yv7vda\" data-start=\"2269\" data-end=\"2292\">Multiple warehouses<\/li>\n<li data-section-id=\"6pulfb\" data-start=\"2293\" data-end=\"2314\">Multiple carriers<\/li>\n<li data-section-id=\"19zvvo5\" data-start=\"2315\" data-end=\"2340\">Hundreds of shipments<\/li>\n<li data-section-id=\"15ck0sq\" data-start=\"2341\" data-end=\"2378\">Different regions and regulations<\/li>\n<\/ul>\n<p data-start=\"2380\" data-end=\"2418\">Manual planning simply cannot keep up.<\/p>\n<p data-start=\"2420\" data-end=\"2627\">When carrier selection is based on habit instead of data, when load consolidation happens in someone\u2019s head, and when actual costs are only known after invoices arrive the business is not managing freight.<\/p>\n<p data-start=\"2629\" data-end=\"2658\">It is absorbing inefficiency.<\/p>\n<p data-start=\"2660\" data-end=\"2751\">That\u2019s why 77% of Chief Supply Chain Officers now rank freight cost as their top challenge.<\/p>\n<h3 data-section-id=\"321wx6\" data-start=\"2758\" data-end=\"2819\">What SAP S\/4HANA TM Freight Optimization Actually Means<\/h3>\n<p data-start=\"2821\" data-end=\"2925\">In simple terms, SAP S\/4HANA TM helps you plan shipments in the most cost-effective way\u00a0 automatically.<\/p>\n<p data-start=\"2927\" data-end=\"2978\">Instead of relying on manual decisions, the system:<\/p>\n<ul data-start=\"2979\" data-end=\"3092\">\n<li data-section-id=\"gkj9va\" data-start=\"2979\" data-end=\"3005\">Selects the best carrier<\/li>\n<li data-section-id=\"y987xk\" data-start=\"3006\" data-end=\"3024\">Optimizes routes<\/li>\n<li data-section-id=\"9gxpx1\" data-start=\"3025\" data-end=\"3057\">Combines shipments efficiently<\/li>\n<li data-section-id=\"1x0m3s0\" data-start=\"3058\" data-end=\"3092\">Calculates real costs in advance<\/li>\n<\/ul>\n<p data-start=\"3094\" data-end=\"3271\"><strong data-start=\"3094\" data-end=\"3110\">For example:<\/strong><br data-start=\"3110\" data-end=\"3113\" \/>Instead of a planner choosing a carrier based on past experience, the system automatically selects the lowest-cost option that still meets delivery timelines.<\/p>\n<p data-start=\"3273\" data-end=\"3284\">The result:<\/p>\n<ul data-start=\"3285\" data-end=\"3341\">\n<li data-section-id=\"u6f4ps\" data-start=\"3285\" data-end=\"3299\">Lower cost<\/li>\n<li data-section-id=\"57wjc2\" data-start=\"3300\" data-end=\"3319\">Faster planning<\/li>\n<li data-section-id=\"1eny0ce\" data-start=\"3320\" data-end=\"3341\">Better visibility<\/li>\n<\/ul>\n<p data-start=\"3343\" data-end=\"3378\">No guesswork. No manual dependency.<\/p>\n<h3 data-section-id=\"1ircspf\" data-start=\"3385\" data-end=\"3432\">The Daily Challenges Logistics Teams Face<\/h3>\n<p data-start=\"3434\" data-end=\"3494\">These are the exact problems we hear from logistics leaders:<\/p>\n<ul data-start=\"3496\" data-end=\"3806\">\n<li data-section-id=\"1l61lk7\" data-start=\"3496\" data-end=\"3548\">\u201cWe don\u2019t know why freight costs keep increasing.\u201d<\/li>\n<li data-section-id=\"3xawke\" data-start=\"3549\" data-end=\"3597\">\u201cPlanning takes 2\u20133 days every week in Excel.\u201d<\/li>\n<li data-section-id=\"1x6h7mb\" data-start=\"3598\" data-end=\"3646\">\u201cWe don\u2019t have real-time shipment visibility.\u201d<\/li>\n<li data-section-id=\"1pktv1t\" data-start=\"3647\" data-end=\"3704\">\u201cWe may be overpaying carriers, but we can\u2019t prove it.\u201d<\/li>\n<li data-section-id=\"txd2vh\" data-start=\"3705\" data-end=\"3759\">\u201cEach warehouse works differently \u2014 no single view.\u201d<\/li>\n<li data-section-id=\"7ue19h\" data-start=\"3760\" data-end=\"3806\">\u201cAs we grow, planning becomes more chaotic.\u201d<\/li>\n<\/ul>\n<p data-start=\"3808\" data-end=\"3840\">All of this points to one issue:<\/p>\n<p data-start=\"3842\" data-end=\"3897\"><strong data-start=\"3842\" data-end=\"3897\">Freight planning has not evolved with the business.<\/strong><\/p>\n<p data-start=\"3899\" data-end=\"3987\">And when planning stays manual, every new shipment adds more complexity \u2014 and more cost.<\/p>\n<h3 data-section-id=\"1v9qmet\" data-start=\"3994\" data-end=\"4047\">Who Should Consider SAP TM Freight Optimization<\/h3>\n<p data-start=\"4049\" data-end=\"4149\">This is not for every company. It is for businesses where logistics is becoming a major cost driver.<\/p>\n<p data-start=\"4151\" data-end=\"4177\">You should consider it if:<\/p>\n<ul data-start=\"4179\" data-end=\"4489\">\n<li data-section-id=\"ul6lfu\" data-start=\"4179\" data-end=\"4238\">You operate multiple warehouses or distribution centers<\/li>\n<li data-section-id=\"txdp97\" data-start=\"4239\" data-end=\"4295\">Logistics cost is rising above 8\u201310% of product cost<\/li>\n<li data-section-id=\"d0ooj4\" data-start=\"4296\" data-end=\"4346\">Planning is still manual (Excel, email, calls)<\/li>\n<li data-section-id=\"1ktnqma\" data-start=\"4347\" data-end=\"4378\">You already use SAP S\/4HANA<\/li>\n<li data-section-id=\"pljwhl\" data-start=\"4379\" data-end=\"4436\">You manage multiple carriers without clear comparison<\/li>\n<li data-section-id=\"9wgmke\" data-start=\"4437\" data-end=\"4489\">Delivery commitments are becoming harder to meet<\/li>\n<\/ul>\n<p data-start=\"4491\" data-end=\"4548\"><strong data-start=\"4491\" data-end=\"4548\">If 2\u20133 of these apply, there is already cost leakage.<\/strong><\/p>\n<h2 data-section-id=\"153n78k\" data-start=\"4555\" data-end=\"4608\">Manual Planning vs SAP TM \u2014 The Real Difference<\/h2>\n<div class=\"TyagGW_tableContainer\">\n<div class=\"group TyagGW_tableWrapper flex flex-col-reverse w-fit\" tabindex=\"-1\">\n<table class=\"w-fit min-w-(--thread-content-width)\" data-start=\"4610\" data-end=\"5115\">\n<thead data-start=\"4610\" data-end=\"4655\">\n<tr data-start=\"4610\" data-end=\"4655\">\n<th class=\"last:pe-10\" data-start=\"4610\" data-end=\"4619\" data-col-size=\"sm\">Factor<\/th>\n<th class=\"last:pe-10\" data-start=\"4619\" data-end=\"4637\" data-col-size=\"sm\">Manual Planning<\/th>\n<th class=\"last:pe-10\" data-start=\"4637\" data-end=\"4655\" data-col-size=\"sm\">SAP S\/4HANA TM<\/th>\n<\/tr>\n<\/thead>\n<tbody data-start=\"4699\" data-end=\"5115\">\n<tr data-start=\"4699\" data-end=\"4748\">\n<td data-start=\"4699\" data-end=\"4714\" data-col-size=\"sm\">Cost Control<\/td>\n<td data-col-size=\"sm\" data-start=\"4714\" data-end=\"4725\">Reactive<\/td>\n<td data-col-size=\"sm\" data-start=\"4725\" data-end=\"4748\">Real-time optimized<\/td>\n<\/tr>\n<tr data-start=\"4749\" data-end=\"4789\">\n<td data-start=\"4749\" data-end=\"4765\" data-col-size=\"sm\">Planning Time<\/td>\n<td data-col-size=\"sm\" data-start=\"4765\" data-end=\"4776\">2\u20133 days<\/td>\n<td data-col-size=\"sm\" data-start=\"4776\" data-end=\"4789\">Few hours<\/td>\n<\/tr>\n<tr data-start=\"4790\" data-end=\"4839\">\n<td data-start=\"4790\" data-end=\"4810\" data-col-size=\"sm\">Carrier Selection<\/td>\n<td data-col-size=\"sm\" data-start=\"4810\" data-end=\"4824\">Habit-based<\/td>\n<td data-col-size=\"sm\" data-start=\"4824\" data-end=\"4839\">Data-driven<\/td>\n<\/tr>\n<tr data-start=\"4840\" data-end=\"4888\">\n<td data-start=\"4840\" data-end=\"4860\" data-col-size=\"sm\">Load Optimization<\/td>\n<td data-col-size=\"sm\" data-start=\"4860\" data-end=\"4875\">Inconsistent<\/td>\n<td data-col-size=\"sm\" data-start=\"4875\" data-end=\"4888\">Automated<\/td>\n<\/tr>\n<tr data-start=\"4889\" data-end=\"4925\">\n<td data-start=\"4889\" data-end=\"4902\" data-col-size=\"sm\">Visibility<\/td>\n<td data-col-size=\"sm\" data-start=\"4902\" data-end=\"4912\">Limited<\/td>\n<td data-col-size=\"sm\" data-start=\"4912\" data-end=\"4925\">Real-time<\/td>\n<\/tr>\n<tr data-start=\"4926\" data-end=\"4981\">\n<td data-start=\"4926\" data-end=\"4940\" data-col-size=\"sm\">Scalability<\/td>\n<td data-col-size=\"sm\" data-start=\"4940\" data-end=\"4964\">Breaks under pressure<\/td>\n<td data-col-size=\"sm\" data-start=\"4964\" data-end=\"4981\">Scales easily<\/td>\n<\/tr>\n<tr data-start=\"4982\" data-end=\"5035\">\n<td data-start=\"4982\" data-end=\"5005\" data-col-size=\"sm\">Delivery Performance<\/td>\n<td data-col-size=\"sm\" data-start=\"5005\" data-end=\"5021\">Unpredictable<\/td>\n<td data-col-size=\"sm\" data-start=\"5021\" data-end=\"5035\">Consistent<\/td>\n<\/tr>\n<tr data-start=\"5036\" data-end=\"5115\">\n<td data-start=\"5036\" data-end=\"5058\" data-col-size=\"sm\"><strong data-start=\"5038\" data-end=\"5057\">Business Impact<\/strong><\/td>\n<td data-col-size=\"sm\" data-start=\"5058\" data-end=\"5085\">Higher cost, more errors<\/td>\n<td data-col-size=\"sm\" data-start=\"5085\" data-end=\"5115\">Lower cost, better control<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<\/div>\n<p data-start=\"5117\" data-end=\"5149\">This is not a small improvement.<\/p>\n<p data-start=\"5151\" data-end=\"5195\">It is a completely different way of working.<\/p>\n<h3 data-section-id=\"lnls65\" data-start=\"5202\" data-end=\"5252\">Real Case Study \u2014 22% Freight Cost Reduction<\/h3>\n<p data-start=\"5254\" data-end=\"5274\"><strong data-start=\"5254\" data-end=\"5272\">Client Profile<\/strong><\/p>\n<ul data-start=\"5275\" data-end=\"5386\">\n<li data-section-id=\"kwffrj\" data-start=\"5275\" data-end=\"5313\">Industry: Industrial Manufacturing<\/li>\n<li data-section-id=\"1bs83hd\" data-start=\"5314\" data-end=\"5331\">Region: USA<\/li>\n<li data-section-id=\"6ut18m\" data-start=\"5332\" data-end=\"5351\">Revenue: ~$180M<\/li>\n<li data-section-id=\"12xhbyc\" data-start=\"5352\" data-end=\"5386\">Freight Orders: 400+ per month<\/li>\n<\/ul>\n<h3 data-section-id=\"gj5abq\" data-start=\"5388\" data-end=\"5409\">Before SCM CHAMPS<\/h3>\n<ul data-start=\"5411\" data-end=\"5647\">\n<li data-section-id=\"ktqocl\" data-start=\"5411\" data-end=\"5436\">Planning fully manual<\/li>\n<li data-section-id=\"u5wwop\" data-start=\"5437\" data-end=\"5459\">2.5 days per cycle<\/li>\n<li data-section-id=\"1jneof7\" data-start=\"5460\" data-end=\"5497\">Freight cost increasing (18% YoY)<\/li>\n<li data-section-id=\"200qm6\" data-start=\"5498\" data-end=\"5522\">Trucks underutilized<\/li>\n<li data-section-id=\"r6wcib\" data-start=\"5523\" data-end=\"5567\">Carrier selection based on relationships<\/li>\n<li data-section-id=\"1c39s4d\" data-start=\"5568\" data-end=\"5593\">On-time delivery: 78%<\/li>\n<li data-section-id=\"1kksnyc\" data-start=\"5594\" data-end=\"5647\">Invoice reconciliation: manual and time-consuming<\/li>\n<\/ul>\n<h3 data-section-id=\"1ijl1ff\" data-start=\"5649\" data-end=\"5680\">What SCM CHAMPS Implemented<\/h3>\n<ul data-start=\"5682\" data-end=\"5939\">\n<li data-section-id=\"sczs9n\" data-start=\"5682\" data-end=\"5724\">Centralized freight planning in SAP TM<\/li>\n<li data-section-id=\"1yylisq\" data-start=\"5725\" data-end=\"5784\">Automated carrier selection based on cost + performance<\/li>\n<li data-section-id=\"26wth9\" data-start=\"5785\" data-end=\"5843\">Load consolidation rules to maximize truck utilization<\/li>\n<li data-section-id=\"aouy6t\" data-start=\"5844\" data-end=\"5899\">Real-time dashboards for cost and delivery tracking<\/li>\n<li data-section-id=\"jzrh4n\" data-start=\"5900\" data-end=\"5939\">Integration with SAP EWM and SAP SD<\/li>\n<\/ul>\n<h3 data-section-id=\"1brz3pp\" data-start=\"5941\" data-end=\"5970\">Results (Within 6 Months)<\/h3>\n<div class=\"TyagGW_tableContainer\">\n<div class=\"group TyagGW_tableWrapper flex flex-col-reverse w-fit\" tabindex=\"-1\">\n<table class=\"w-fit min-w-(--thread-content-width)\" data-start=\"5972\" data-end=\"6214\">\n<thead data-start=\"5972\" data-end=\"5999\">\n<tr data-start=\"5972\" data-end=\"5999\">\n<th class=\"last:pe-10\" data-start=\"5972\" data-end=\"5981\" data-col-size=\"sm\">Metric<\/th>\n<th class=\"last:pe-10\" data-start=\"5981\" data-end=\"5990\" data-col-size=\"sm\">Before<\/th>\n<th class=\"last:pe-10\" data-start=\"5990\" data-end=\"5999\" data-col-size=\"sm\">After<\/th>\n<\/tr>\n<\/thead>\n<tbody data-start=\"6026\" data-end=\"6214\">\n<tr data-start=\"6026\" data-end=\"6057\">\n<td data-start=\"6026\" data-end=\"6041\" data-col-size=\"sm\">Freight Cost<\/td>\n<td data-col-size=\"sm\" data-start=\"6041\" data-end=\"6048\">100%<\/td>\n<td data-col-size=\"sm\" data-start=\"6048\" data-end=\"6057\">\u2193 22%<\/td>\n<\/tr>\n<tr data-start=\"6058\" data-end=\"6098\">\n<td data-start=\"6058\" data-end=\"6074\" data-col-size=\"sm\">Planning Time<\/td>\n<td data-col-size=\"sm\" data-start=\"6074\" data-end=\"6085\">2.5 days<\/td>\n<td data-col-size=\"sm\" data-start=\"6085\" data-end=\"6098\">&lt; 4 hours<\/td>\n<\/tr>\n<tr data-start=\"6099\" data-end=\"6131\">\n<td data-start=\"6099\" data-end=\"6118\" data-col-size=\"sm\">On-Time Delivery<\/td>\n<td data-col-size=\"sm\" data-start=\"6118\" data-end=\"6124\">78%<\/td>\n<td data-col-size=\"sm\" data-start=\"6124\" data-end=\"6131\">94%<\/td>\n<\/tr>\n<tr data-start=\"6132\" data-end=\"6173\">\n<td data-start=\"6132\" data-end=\"6145\" data-col-size=\"sm\">Visibility<\/td>\n<td data-col-size=\"sm\" data-start=\"6145\" data-end=\"6155\">Limited<\/td>\n<td data-col-size=\"sm\" data-start=\"6155\" data-end=\"6173\">Full real-time<\/td>\n<\/tr>\n<tr data-start=\"6174\" data-end=\"6214\">\n<td data-start=\"6174\" data-end=\"6192\" data-col-size=\"sm\">Invoice Process<\/td>\n<td data-col-size=\"sm\" data-start=\"6192\" data-end=\"6201\">Manual<\/td>\n<td data-col-size=\"sm\" data-start=\"6201\" data-end=\"6214\">Automated<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<\/div>\n<p data-start=\"6216\" data-end=\"6282\">The cost savings alone paid back the investment in under 9 months<a href=\"https:\/\/www.scmchamps.com\/blog\/sap-tm-transportation-cost-reduction\/\">.<\/a><\/p>\n<h3 data-section-id=\"8kskhl\" data-start=\"6289\" data-end=\"6332\">How SCM CHAMPS Delivers These Results<\/h3>\n<p data-start=\"6334\" data-end=\"6369\">We follow a simple 3-step approach:<\/p>\n<h3 data-section-id=\"kdcwal\" data-start=\"6371\" data-end=\"6384\">1. Assess<\/h3>\n<ul data-start=\"6385\" data-end=\"6510\">\n<li data-section-id=\"est7fs\" data-start=\"6385\" data-end=\"6420\">Identify where money is leaking<\/li>\n<li data-section-id=\"6we78k\" data-start=\"6421\" data-end=\"6448\">Review planning process<\/li>\n<li data-section-id=\"zikinj\" data-start=\"6449\" data-end=\"6484\">Analyze carrier usage and rates<\/li>\n<li data-section-id=\"6wkvee\" data-start=\"6485\" data-end=\"6510\">Find integration gaps<\/li>\n<\/ul>\n<h3 data-section-id=\"1w5ycz6\" data-start=\"6512\" data-end=\"6528\">2. Configure<\/h3>\n<ul data-start=\"6529\" data-end=\"6670\">\n<li data-section-id=\"zh84pt\" data-start=\"6529\" data-end=\"6575\">Set up SAP TM based on real business needs<\/li>\n<li data-section-id=\"9afv8m\" data-start=\"6576\" data-end=\"6606\">Automate carrier selection<\/li>\n<li data-section-id=\"ek6z13\" data-start=\"6607\" data-end=\"6639\">Define routes and load rules<\/li>\n<li data-section-id=\"149xrar\" data-start=\"6640\" data-end=\"6670\">Enable automated tendering<\/li>\n<\/ul>\n<h3 data-section-id=\"13cz2yq\" data-start=\"6672\" data-end=\"6687\">3. Optimize<\/h3>\n<ul data-start=\"6688\" data-end=\"6834\">\n<li data-section-id=\"w1wi34\" data-start=\"6688\" data-end=\"6717\">Automate repeat scenarios<\/li>\n<li data-section-id=\"3jgyyw\" data-start=\"6718\" data-end=\"6762\">Track KPIs (cost, delivery, performance)<\/li>\n<li data-section-id=\"1k5gzto\" data-start=\"6763\" data-end=\"6797\">Integrate with SAP EWM, SD, FI<\/li>\n<li data-section-id=\"1xx453m\" data-start=\"6798\" data-end=\"6834\">Continuously improve performance<\/li>\n<\/ul>\n<h3 data-section-id=\"14k6imq\" data-start=\"6841\" data-end=\"6874\">What Results You Can Expect<\/h3>\n<p data-start=\"6876\" data-end=\"6906\">Based on real implementations:<\/p>\n<ul data-start=\"6908\" data-end=\"7075\">\n<li data-section-id=\"1wnocm\" data-start=\"6908\" data-end=\"6944\">18\u201325% reduction in freight cost<\/li>\n<li data-section-id=\"v2bwix\" data-start=\"6945\" data-end=\"6982\">60\u201370% reduction in planning time<\/li>\n<li data-section-id=\"19u5hby\" data-start=\"6983\" data-end=\"7010\">90\u201395% on-time delivery<\/li>\n<li data-section-id=\"17fsvt0\" data-start=\"7011\" data-end=\"7048\">Full visibility across operations<\/li>\n<li data-section-id=\"gdwdw3\" data-start=\"7049\" data-end=\"7075\">ROI within 9\u201312 months<\/li>\n<\/ul>\n<h3 data-section-id=\"19mtinb\" data-start=\"7082\" data-end=\"7114\">The Cost of Doing Nothing<\/h3>\n<p data-start=\"7116\" data-end=\"7150\">Delaying this decision has a cost.<\/p>\n<ul data-start=\"7152\" data-end=\"7272\">\n<li data-section-id=\"1jy1lcu\" data-start=\"7152\" data-end=\"7186\">Freight costs will keep rising<\/li>\n<li data-section-id=\"16a8sk5\" data-start=\"7187\" data-end=\"7225\">Manual planning will keep breaking<\/li>\n<li data-section-id=\"rlvi61\" data-start=\"7226\" data-end=\"7272\">Customer expectations will keep increasing<\/li>\n<\/ul>\n<p data-start=\"7274\" data-end=\"7319\">Meanwhile, competitors who automate now will:<\/p>\n<ul data-start=\"7320\" data-end=\"7388\">\n<li data-section-id=\"1uei93h\" data-start=\"7320\" data-end=\"7345\">Operate at lower cost<\/li>\n<li data-section-id=\"1ub8ziy\" data-start=\"7346\" data-end=\"7364\">Deliver faster<\/li>\n<li data-section-id=\"1nyucdm\" data-start=\"7365\" data-end=\"7388\">Scale without chaos<\/li>\n<\/ul>\n<p data-start=\"7390\" data-end=\"7413\">The gap will only grow.<\/p>\n<h3 data-section-id=\"1aemwg1\" data-start=\"7420\" data-end=\"7446\">Take the First Step<\/h3>\n<p data-start=\"7448\" data-end=\"7531\">If you want to reduce freight cost and remove manual planning, <a href=\"https:\/\/www.scmchamps.com\/\"><strong>SCM CHAMPS<\/strong><\/a> can help.<\/p>\n<p data-start=\"7533\" data-end=\"7658\">We specialize in <a href=\"https:\/\/www.scmchamps.com\/sap-modules\/s4-hana\"><strong>SAP S\/4HANA<\/strong><\/a> TM implementations for manufacturers and distributors, with a clear focus on measurable results.<\/p>\n<h3 data-section-id=\"1t6jywb\" data-start=\"7660\" data-end=\"7676\">Get Started:<\/h3>\n<ul data-start=\"7677\" data-end=\"7759\">\n<li data-section-id=\"bb3a7p\" data-start=\"7677\" data-end=\"7705\">Book a free consultation<\/li>\n<li data-section-id=\"8lacsh\" data-start=\"7706\" data-end=\"7739\">Get a freight cost assessment<\/li>\n<li data-section-id=\"1xc4tbj\" data-start=\"7740\" data-end=\"7759\">See a live demo<\/li>\n<\/ul>\n<p data-start=\"7761\" data-end=\"7855\">No generic pitch. Just a practical discussion about your current challenges and opportunities.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Freight Problem No One Talks About \u2014 Until It Hits the Numbers Every quarter,&#8230;<\/p>\n","protected":false},"author":1,"featured_media":1876,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[41],"tags":[264,263],"class_list":["post-1875","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-sap-tm","tag-freight-cost-reduction-sap-tm","tag-sap-s-4hana-tm-freight-optimization"],"_links":{"self":[{"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/posts\/1875","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/comments?post=1875"}],"version-history":[{"count":1,"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/posts\/1875\/revisions"}],"predecessor-version":[{"id":1877,"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/posts\/1875\/revisions\/1877"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/media\/1876"}],"wp:attachment":[{"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/media?parent=1875"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/categories?post=1875"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.scmchamps.com\/blog\/wp-json\/wp\/v2\/tags?post=1875"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}